Calendar

Dec
13
Thu
Open House – Summerfield Wastewater Pump Station Removal Project @ Southwest YMCA
Dec 13 @ 5:00 pm – 6:00 pm
Dec
20
Thu
Carnahan Wastewater Pump Station Removal Project Open House @ The Apostolic Church
Dec 20 @ 5:00 pm – 6:00 pm

This project will include the removal of existing Carnahan Wastewater Pump Station #22 and installation of a new gravity main sewer system. The project is north of SE 29th Street to SE 28th Court, and east of SE Golden Ave.

For more information, please call Zach Stueve, city wastewater engineer, at 785-368-3122.

Jan
24
Thu
T-291057.00 Ash Street Pump Station Force Main Replacement Open House @ Holliday Building
Jan 24 @ 5:30 pm – 6:30 pm

T-291057.00 Ash Street Pump Station Force Main Replacement

Project consists of the construction and installation of all required upgrades to the existing pumps, gates, valves, instrumentation and controls, as well as a new force main, to the existing sanitary pump station located at 545 NE Lake St.

For more information please call Michelle Neiswender, City Wastewater Engineer at 785-368-4251.

Mar
15
Mon
Public Works Infrastructure Committee Meeting @ Holliday Building - 1st Floor Conference Room
Mar 15 @ 2:00 pm – 4:00 pm

Please find the meeting agenda here.

This meeting will be hybrid, with virtual or in-person attendance options available. In-person seating will be limited. Please contact the City Council Office by 12:00pm on 3/15 to receive the Zoom log-in information.

Apr
29
Thu
Public Works Infrastructure Committee Meeting @ Holliday Building - 1st Floor Conference Room
Apr 29 @ 10:00 am – 12:00 pm

Due to ongoing COVID-19 safety measures, virtual attendance for this meeting will also be offered. To attend virtually, please contact the City Council office by 5:00pm on April 28th to attain the log-in information.

Additional items pertaining to the meeting will be made available on the committee’s webpage.

Agenda:

  1. Call to Order
  2. Approve March 15, 2021 meeting minutes
  3. Introduction: Public Works Director James Jackson
  4. 2021 Project Update
  5. Median Update
  6. Assetic-based Capital Work Program
  7. Items from Staff
    1. Modifying existing Sidewalk Repair Program (50/50 Program) into a Cost Sharing Program
  1. Items from Committee
    1. Discussion: Urish (21st to 29th ) and 17th & Wanamaker to I-470
  2. Other Items
  3. Schedule next meeting date; Adjourn